Ashtead level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR BTH3).

predicted
CLOSED
for 3 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† now Β· 2 min late

Next 30 min

CLOSED 06:26–06:29 3m
OPEN 06:29–06:40 12m
CLOSED 06:40–06:44 3m
OPEN 06:44–06:46 3m
CLOSED 06:46–06:50 4m
MAY OPEN 06:50–06:52 2m
CLOSED 06:52–06:57 β†’ 5m
Under the hood
Wed 11 Nov Β· 06:26
Today Tomorrow

Trains in window

06:27 πŸš† 2I03 Horsham β†’ London Victoria (C) Up (SW β†’ NE) approaching
06:28 πŸš„ 1D10 Dorking β†’ London Waterloo Up (SW β†’ NE) approaching
06:43 πŸšƒ 5D11 London Waterloo β†’ Dorking Down (NE β†’ SW) +2 min
06:50 πŸš† 2D05 London Waterloo β†’ Guildford Up (SW β†’ NE) +1 min
06:50 πŸš† 2I05 Horsham β†’ London Victoria (C) Up (SW β†’ NE) on time
06:55 πŸš† 2D12 Guildford β†’ London Waterloo Up (SW β†’ NE) on time
06:56 πŸš† 2I02 London Victoria (C) β†’ Dorking Up (SW β†’ NE) +4 min
πŸš„Express passenger πŸš†Passenger πŸšƒEmpty stock
now 06:26:26 Β· 171 avg Β· 7 in window
live observation: 2 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,691 active Β· 31,203 delays Β· 1,983 cancelled Β· 0 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Ashtead crossing is predicted to be closed for about 7 h 47 min between 06:00 and 22:00, across roughly 93 closures. The longest single predicted closure is 11 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.0 min (00:10–00:16, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:38–07:38 in the morning and around 17:14–18:14 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Woodfield Lane in Ashtead, Surrey, next to the station.

Ashtead is a CCTV-monitored manual barrier crossing (CCTV) on the Epsom–Leatherhead line (Wessex route · ELR BTH3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 566 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.9% of the warnings we could verify came true.

Typical timing error was Β±342s (9 in 10 within 377s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?