Manually-controlled barrier level crossing on the North West route (ELR FHR4).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Bamber Bridge crossing is predicted to be closed for about 3 h 30 min between 06:00 and 22:00, across roughly 43 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 09:15–10:15 in the morning and around 13:35–14:35 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Bamber Bridge is a manually-controlled barrier crossing (MCB/MB) on the Bolton–Blackburn line (North West route · ELR FHR4). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 519 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.
Typical timing error was ±246s (9 in 10 within 492s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.