CCTV-monitored manual barrier level crossing on the West Coast South route (ELR CMD2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 07:10 | π 2K82 | Crewe β Stafford Up (N β S) | +8 min |
| 07:16 | π 1H13 | Birmingham New Street β Manchester Piccadilly Down (S β N) | passed |
| 07:17 | π 9R26 | Manchester Piccadilly β London Euston Up (N β S) | +9 min |
| 07:19 | π 1R16 | Manchester Piccadilly β London Euston Up (N β S) | passed |
| 07:37 | π 1H02 | London Euston β Manchester Piccadilly Down (S β N) | on time |
| 07:39 | π 1R19 | Manchester Piccadilly β London Euston Up (N β S) | +2 min |
| 07:43 | π 1H14 | Birmingham New Street β Manchester Piccadilly Down (S β N) | on time |
| 07:52 | π 1V45 | Manchester Piccadilly β Bristol Temple Meads Up (N β S) | +4 min |
On todayβs timetable, Barlaston crossing is predicted to be closed for about 9 h 29 min between 06:00 and 22:00, across roughly 112 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 7.7 min (07:12–07:20, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 09:27β10:27 in the morning and around 12:07β13:07 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Station Road in Barlaston, Staffordshire.
Barlaston is a CCTV-monitored manual barrier crossing (CCTV) on the StaffordβWedgwood line (West Coast South route · ELR CMD2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 1,045 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.1% of the warnings we could verify came true.