User-worked with stop lights level crossing on the Kent route (ELR VIR).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:56 | π 1S12 | London Victoria (E) β Ramsgate Down (W β E) | passed |
| 10:04 | π 1F16 | St. Pancras International β Faversham Down (W β E) | approaching |
| 10:09 | π 1C25 | Ramsgate β St. Pancras International Up (E β W) | approaching |
| 10:11 | π 1P24 | Dover Priory β London Victoria (E) Up (E β W) | on time |
| 10:20 | π 1S14 | London Victoria (E) β Dover Priory Down (W β E) | +2 min |
| 10:25 | π 1C18 | St. Pancras International β Ramsgate Down (W β E) | +2 min |
On todayβs timetable, Bax crossing is predicted to be closed for about 4 h 13 min between 06:00 and 22:00, across roughly 127 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 0.9 min (08:14–08:15, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:46β09:46 in the morning and around 19:10β20:10 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Bax, Kent.
Bax is a user-worked with stop lights crossing (UWCMSL) on the Rainham (Kent)βFolkestone East Train Road line (Kent route · ELR VIR). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 958 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.
Typical timing error was Β±2s (9 in 10 within 14s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.