Bedlington North Lc (cctv) level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR BWC).

predicted
OPEN
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 5 min · 9 min late

Next 30 min

OPEN 06:59–07:01 2m
CLOSED 07:01–07:04 3m
OPEN 07:04–07:08 4m
CLOSED 07:08–07:11 3m
OPEN 07:11–07:24 12m
CLOSED 07:24–07:27 3m
OPEN 07:27–07:39 → 12m
Under the hood
Wed 11 Nov · 06:59
Today Tomorrow

Trains in window

07:04 🚆 2T05 Newcastle → Ashington Down (SE → NW) +9 min
07:11 🚆 2T06 Ashington → Newcastle Up (NW → SE) active
07:27 🚆 2T07 Newcastle → Ashington Down (SE → NW) on time
🚆Passenger
now 06:59:11 · 76 avg · 3 in window
live observation: 1 up · 0 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,723 active · 31,234 delays · 2,031 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Bedlington North Lc (cctv) crossing is predicted to be closed for about 4 h 41 min between 06:00 and 22:00, across roughly 66 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:10–00:13, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 14:19–15:19 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Bedlington Station, Northumberland, next to Bedlington station.

Bedlington North Lc (cctv) is a CCTV-monitored manual barrier crossing (CCTV) on the Newcastle–Ashington line (North and East route · ELR BWC). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 239 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±2s (9 in 10 within 11s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?