User-worked with stop lights level crossing on the Scotland route (ELR ANI2).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:26 | 🚄 1A10 | Inverness → Aberdeen Up (SW → NE) | approaching |
| 09:30 | 🚄 1H80 | Keith Branch → Kyle of Lochalsh Down (NE → SW) | +2 min |
On today’s timetable, Bogton Nursery crossing is predicted to be closed for about 58 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 0.6 min (06:29–06:30, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:31–07:31 in the morning and around 17:37–18:37 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Bogton Nursery is a user-worked with stop lights crossing (UWCMSL) on the Elgin–Inverness Airport line (Scotland route · ELR ANI2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 202 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±537s (9 in 10 within 816s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.