Manually-controlled barrier level crossing on the North and East route (ELR TJG2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Boothferry Road crossing is predicted to be closed for about 4 min between 06:00 and 22:00, across roughly 1 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:00–07:00 in the morning. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Boothferry Road in Goole, East Riding of Yorkshire, next to the station.
Boothferry Road is a manually-controlled barrier crossing (MCB/MB) on the Thorne North–Hull Dairycoates Tlcn GBRf line (North and East route · ELR TJG2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 248 trains through this crossing.
99.6% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.
Typical timing error was ±18s (9 in 10 within 207s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.