Automatic barrier locally monitored level crossing on the Anglia route (ELR ESK).
| No trains in the next 30 minutes. |
On today’s timetable, Bramfield crossing is predicted to be closed for about 1 h 8 min between 06:00 and 22:00, across roughly 30 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:24–07:24 in the morning and around 18:39–19:39 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Bramfield is a automatic barrier locally monitored crossing (ABCL) on the Woodbridge–Oulton Broad South line (Anglia route · ELR ESK). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 215 trains through this crossing.
99.5% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±58s (9 in 10 within 144s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.