CCTV-monitored manual barrier level crossing on the North West route (ELR PBN).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:50 | π 1N82 | Liverpool Lime Street HL/ML β Blackpool North Down (NE β SW) | -2 min |
| 09:58 | π 1B17 | York β Blackpool North Down (NE β SW) | passed |
| 09:58 | π 1Y60 | Blackpool North β Manchester Airport Up (SW β NE) | passed |
| 10:08 | π 1F08 | Blackpool North β Liverpool Lime Street HL/ML Up (SW β NE) | approaching |
| 10:17 | π 1N57 | Manchester Airport β Blackpool North Down (NE β SW) | on time |
| 10:23 | π 1B24 | Blackpool North β York Up (SW β NE) | active |
| 10:30 | π 1Y61 | Blackpool North β Manchester Airport Up (SW β NE) | active |
On todayβs timetable, Carleton Crossing crossing is predicted to be closed for about 8 h 7 min between 06:00 and 22:00, across roughly 112 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 7.7 min (09:28–09:36, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:07β08:07 in the morning and around 19:45β20:45 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Blackpool Road in Little Carleton, Lancashire.
Carleton Crossing is a CCTV-monitored manual barrier crossing (CCTV) on the PrestonβUp line (North West route · ELR PBN). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 992 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.
Typical timing error was Β±7s (9 in 10 within 99s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.