Chard Junction level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR BAE2).

predicted
OPEN
for the next 30 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 07:02–07:43 → 41m
Under the hood
Mon 12 Oct · 07:02
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 07:02:02 · 20 avg · 0 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,686 active · 24,887 delays · 2,501 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Chard Junction crossing is predicted to be closed for about 1 h 4 min between 06:00 and 22:00, across roughly 15 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:01–00:04, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:54–10:54 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Chard Junction, Somerset.

Chard Junction is a CCTV-monitored manual barrier crossing (CCTV) on the Crewkerne–Axminster line (Wessex route · ELR BAE2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 144 trains through this crossing.

97.2% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?