Chettisham level crossing

Manually-controlled barrier with obstacle detection level crossing on the Anglia route (ELR EMP).

predicted
CLOSED
for 26s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› now Β· 2 min late

Next 30 min

CLOSED 06:45–06:46 26s
OPEN 06:46–06:48 2m
CLOSED 06:48–06:50 3m
OPEN 06:50–06:55 5m
CLOSED 06:55–06:58 3m
MAY OPEN 06:58–06:59 42s
CLOSED 06:59–07:02 3m
OPEN 07:02–07:17 β†’ 15m
Under the hood
Wed 11 Nov Β· 06:45
Today Tomorrow

Trains in window

06:42 πŸš› 4M07 Felixstowe North GBRF β†’ Birch Coppice GBRf Down (SE β†’ NW) passed
06:45 πŸš› 4L83 Leeds F.L.T. β†’ Felixstowe North F.L.T. Up (NW β†’ SE) +2 min
06:50 πŸš„ 1R60 Norwich β†’ Liverpool Lime Street HL/ML Down (SE β†’ NW) approaching
06:51 πŸš› 6L53 Tunstead Sdgs (FHH) β†’ Parkeston S.S. Up (NW β†’ SE) no show
06:58 πŸš„ 1L01 Nottingham β†’ Norwich Up (NW β†’ SE) on time
07:01 πŸš† 2E70 Colchester β†’ Peterborough Down (SE β†’ NW) -1 min
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 06:45:40 Β· 220 avg Β· 6 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,702 active Β· 31,219 delays Β· 2,006 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Chettisham crossing is predicted to be closed for about 5 h 13 min between 06:00 and 22:00, across roughly 75 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 7.3 min (06:10–06:18, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:27–07:27 in the morning and around 17:43–18:43 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Lynn Road in Chettisham, Cambridgeshire.

Chettisham is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Ely–March Up Yard GBRF line (Anglia route · ELR EMP). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 796 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?