CCTV-monitored manual barrier level crossing on the Anglia route (ELR LTN1).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 02:43 | 🚧 3S10 | Stowmarket DGL → Stowmarket DGL Up (NE → SW) | no show |
On today’s timetable, Church Lane CCTV (LTN1) crossing is predicted to be closed for about 11 h 10 min between 06:00 and 22:00, across roughly 116 closures. The longest single predicted closure is 19 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.6 min (23:59–00:02, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:11–08:11 in the morning and around 18:30–19:30 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Church Lane CCTV (LTN1) is a cctv-monitored manual barrier crossing (CCTV) on the Ingatestone–Chelmsford line (Anglia route · ELR LTN1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 1,571 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.
Typical timing error was ±2s (9 in 10 within 60s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.