next: πŸš„ now Β· 4 min late

Next 30 min

CLOSED 09:58–09:58 15s
MAY OPEN 09:58–09:58 33s
CLOSED 09:58–10:02 4m
OPEN 10:02–10:07 5m
CLOSED 10:07–10:10 3m
OPEN 10:10–10:42 β†’ 32m
Under the hood
Thu 22 Oct Β· 09:58
Today Tomorrow

Trains in window

09:49 πŸš„ 1L14 St. Pancras International β†’ Ramsgate Down (SW β†’ NE) on time
09:58 πŸš„ 1J16 St. Pancras International β†’ Margate Down (SW β†’ NE) approaching
10:01 πŸš„ 1J25 Margate β†’ St. Pancras International Up (NE β†’ SW) -2 min
10:02 🚧 3W74 Tonbridge West Yard GBRf β†’ Tonbridge West Yard GBRf Down (SW β†’ NE) +5 min
10:10 πŸš„ 1L27 Ramsgate β†’ Ashford International Up (NE β†’ SW) active
πŸš„Express passenger 🚧Engineering
now 09:58:11 Β· 149 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,697 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Cliffsend crossing is predicted to be closed for about 7 h 16 min between 06:00 and 22:00, across roughly 88 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 11.2 min (07:50–08:01, 4 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:56–07:56 in the morning and around 19:02–20:02 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Foads Hill in Cliffsend, Kent.

Cliffsend is a CCTV-monitored manual barrier crossing (CCTV) on the Minster–Ramsgate line (Kent route · ELR ACR). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 954 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was Β±17s (9 in 10 within 101s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.