Cottage Lane level crossing

Automatic half-barrier level crossing on the East Coast route (ELR NOB1).

predicted
OPEN
for 17 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 17 min · 3 min early

Next 30 min

OPEN 11:10–11:26 17m
CLOSED 11:26–11:27 1m
OPEN 11:27–11:33 6m
CLOSED 11:33–11:36 3m
OPEN 11:36–12:00 → 23m
Under the hood
Mon 07 Sep · 11:10
Today Tomorrow

Trains in window

11:00 🚄 1K63 LincolnCrewe Up (NE → SW) on time
11:06 🚄 1N54 CreweLincoln Down (SW → NE) -2 min
11:27 🚆 2A20 CleethorpesMatlock Up (NE → SW) -3 min
11:34 🚆 2N55 MatlockLincoln Down (SW → NE) +13 min
11:36 🚄 1B85 LincolnLondon Kings Cross Up (NE → SW) active
🚄Express passenger 🚆Passenger
now 11:10:10 · 81 avg · 5 in window
live observation: 1 up · 0 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,732 active · 30,455 delays · 3,241 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Cottage Lane crossing is predicted to be closed for about 2 h 57 min between 06:00 and 22:00, across roughly 75 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (05:37–05:39, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:14–07:14 in the morning and around 13:18–14:18 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Cottage Lane is a automatic half-barrier crossing (AHB) on the Newark North Gate–Hykeham line (East Coast route · ELR NOB1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 287 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.8% of the warnings we could verify came true.

Typical timing error was ±111s (9 in 10 within 153s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?