CCTV-monitored manual barrier level crossing on the Sussex route (ELR TBH1).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 02:38 | 🚃 5C01 | Bognor Sidings → Three Bridges Up (W → E) | no show |
On today’s timetable, Crawley Horsham Road crossing is predicted to be closed for about 5 h 24 min between 06:00 and 22:00, across roughly 101 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (00:00–00:03, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:38–07:38 in the morning and around 12:13–13:13 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Crawley Horsham Road is a cctv-monitored manual barrier crossing (CCTV) on the Three Bridges–Horsham line (Sussex route · ELR TBH1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 939 trains through this crossing.
99.9% of observed passes were being warned about on this page when they passed, and 96.8% of the warnings we could verify came true.
Typical timing error was ±79s (9 in 10 within 217s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.