CCTV-monitored manual barrier level crossing on the Sussex route (ELR TBH1).
| 01:09 | 3S94 | 🚧 | HORSHUS → HORSHUS | → from Horsham | no show |
On today’s timetable, Crawley Horsham Road crossing is predicted to be closed for about 6 h 58 min between 06:00 and 22:00, across roughly 94 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (00:30–00:33, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:28–08:28 in the morning and around 19:29–20:29 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Crawley Horsham Road is a cctv-monitored manual barrier crossing (CCTV) on the Three Bridges–Horsham line (Sussex route · ELR TBH1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 918 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 96.7% of the warnings we could verify came true.
Typical timing error was ±53s (9 in 10 within 111s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.