Creykes (uwcmsl) level crossing

User-worked with stop lights level crossing on the North and East route (ELR TJG2).

predicted
CLOSED
for 5s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: now · scheduled

Next 30 min

CLOSED 04:56–04:56 5s
OPEN 04:56–05:52 → 56m
Under the hood
Mon 07 Sep · 04:56
Today Tomorrow

Trains in window

04:56 4R47 ?? Up (NE → SW) approaching
Other
now 04:56:14 · 79 avg · 1 in window
live observation: 4 up · 0 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,724 active · 21,569 delays · 2,956 cancelled · 0 reconnects
About this crossing

How often it closes

On today’s timetable, Creykes (uwcmsl) crossing is predicted to be closed for about 2 h 1 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 0.6 min (00:38–00:39, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:40–08:40 in the morning and around 19:32–20:32 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Creykes (uwcmsl) is a user-worked with stop lights crossing (UWCMSL) on the Goole–Hull Dairycoates Tlcn GBRf line (North and East route · ELR TJG2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 269 trains through this crossing.

91.4% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±9s (9 in 10 within 332s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?