User-worked with stop lights level crossing on the Western route (ELR BHL).
| No trains in the next 30 minutes. |
On today’s timetable, Crofton crossing is predicted to be closed for about 1 h 26 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 09:33–10:33 in the morning and around 18:02–19:02 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Crofton is a user-worked with stop lights crossing (UWCMSL) on the Newbury–Pewsey line (Western route · ELR BHL). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 76 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed.