CCTV-monitored manual barrier level crossing on the Wessex route (ELR SWE).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:53 | 🚆 2U24 | Windsor & Eton Riverside → London Waterloo Up (NW → SE) | passed |
| 10:16 | 🚆 2U21 | London Waterloo → Windsor & Eton Riverside Down (SE → NW) | approaching |
| 10:24 | 🚆 2U26 | Windsor & Eton Riverside → London Waterloo Up (NW → SE) | active |
On today’s timetable, Datchet crossing is predicted to be closed for about 4 h 46 min between 06:00 and 22:00, across roughly 62 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 4.4 min (07:51–07:55, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:53–07:53 in the morning and around 18:12–19:12 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on High Street in Datchet, Berkshire, next to the station.
Datchet is a CCTV-monitored manual barrier crossing (CCTV) on the Sunnymeads–Windsor & Eton Riverside line (Wessex route · ELR SWE). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 531 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±12s (9 in 10 within 45s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.