Manual gate level crossing on the Anglia route (ELR CCH).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Dullingham crossing is predicted to be closed for about 2 h 19 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (02:11–02:14, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:01–09:01 in the morning and around 17:00–18:00 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Station Road near Dullingham, Cambridgeshire, next to the station.
Dullingham is a manual gate crossing (MGH) on the Cambridge Reception Sdgs–Ely line (Anglia route · ELR CCH). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 261 trains through this crossing.
99.2% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.