User-worked with stop lights level crossing on the Western route (ELR SWM1).
| No trains in the next 30 minutes. |
On today’s timetable, Ebley crossing is predicted to be closed for about 58 min between 06:00 and 22:00, across roughly 36 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 0.6 min (00:52–00:52, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:23–07:23 in the morning and around 12:54–13:54 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Ebley is a user-worked with stop lights crossing (UWCMSL) on the Stroud–Westerleigh Puma DBC line (Western route · ELR SWM1). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 124 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.5% of the warnings we could verify came true.
Typical timing error was ±6s (9 in 10 within 185s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.