User-worked with stop lights level crossing on the Anglia route (ELR BGK).
| 01:16 | 1C74 | 🚄 | KNGX → CAMBDGE | → from Ely | +6 min |
| 01:30 | 3S20 | 🚧 | BROXGBF → BROXGBF | → from Ely | no show |
On today’s timetable, Ely West River crossing is predicted to be closed for about 6 h 10 min between 06:00 and 22:00, across roughly 184 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 0.6 min (00:01–00:02, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:09–07:09 in the morning and around 16:55–17:55 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Ely West River is a user-worked with stop lights crossing (UWCMSL) on the Chesterton Junction FHH–Ely line (Anglia route · ELR BGK). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 10 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±151s (9 in 10 within 298s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.