Heck Lane level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR WAG1).

predicted
CLOSED
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 now · 47 min early

Next 30 min

CLOSED 02:12–02:15 4m
MAY OPEN 02:15–02:17 2m
CLOSED 02:17–02:22 5m
OPEN 02:22–02:48 → 26m
Under the hood
Mon 07 Sep · 02:12
Today Tomorrow

Trains in window

02:03 🚛 4M51 South Bank Tees Dock (DRS)Daventry DRS (Tesco) Up (E → W) no show
02:12 🚛 6M26 Tees N.Y.Knowsley Freight Terminal Up (E → W) -47 min
02:15 🚛 6H50 Immingham Biomass LP (DBS)Drax Power Station Down (W → E) approaching
02:21 🚃 4R45 Drax Power StationImmingham Biomass LP (DBS) Up (E → W) approaching
🚃Empty stock 🚛Freight
now 02:12:12 · 100 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,282 active · 21,045 delays · 2,871 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Heck Lane crossing is predicted to be closed for about 3 h 21 min between 06:00 and 22:00, across roughly 36 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.9 min (00:19–00:24, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:03–07:03 in the morning and around 12:22–13:22 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Heck Lane is a cctv-monitored manual barrier crossing (CCTV) on the Whitley Bridge–Drax Power Station line (North and East route · ELR WAG1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 273 trains through this crossing.

99.6% of observed passes were being warned about on this page when they passed, and 73.5% of the warnings we could verify came true.

Typical timing error was ±11s (9 in 10 within 840s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?