Holywell level crossing

Automatic half-barrier level crossing on the North and East route (ELR EJM).

predicted
OPEN
for 12 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 13 min · 4 min late

Next 30 min

OPEN 09:21–09:33 12m
CLOSED 09:33–09:34 2m
OPEN 09:34–09:41 7m
CLOSED 09:41–09:42 2m
OPEN 09:42–09:59 → 16m
Under the hood
Mon 07 Sep · 09:21
Today Tomorrow

Trains in window

09:13 🚆 2T15 NewcastleAshington Down (SE → NW) +1 min
09:14 🚛 6M80 North Blyth GBRFShap Summit Quarry GBRf Up (NW → SE) no show
09:34 🚆 2T14 AshingtonNewcastle Up (NW → SE) +4 min
09:42 🚆 2T17 NewcastleAshington Down (SE → NW) active
🚆Passenger 🚛Freight
now 09:21:31 · 62 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,495 active · 28,113 delays · 3,113 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Holywell crossing is predicted to be closed for about 2 h 23 min between 06:00 and 22:00, across roughly 67 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (06:01–06:03, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:57–10:57 in the morning and around 13:49–14:49 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Holywell is a automatic half-barrier crossing (AHB-X) on the Northumberland Park (NE)–Ashington line (North and East route · ELR EJM). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 469 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±7s (9 in 10 within 125s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?