Manually-controlled barrier with obstacle detection level crossing on the Central route (ELR PRA).

predicted
CLOSED
for 3 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 3 min Β· 35 min early

Next 30 min

CLOSED 10:00–10:03 3m
OPEN 10:03–10:10 7m
CLOSED 10:10–10:13 3m
OPEN 10:13–10:23 10m
CLOSED 10:23–10:26 3m
OPEN 10:26–11:13 β†’ 47m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

10:03 πŸš› 6V37 Quainton Railhead β†’ Tytherington Up -35 min
10:13 πŸš† 2A17 Princes Risborough β†’ Aylesbury Down active
10:26 πŸš† 2P29 Aylesbury β†’ Princes Risborough Up active
πŸš†Passenger πŸš›Freight
now 10:00:40 Β· 58 avg Β· 3 in window
live observation: 2 up Β· 0 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,965 cancelled Β· 9 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Marsh Lane crossing is predicted to be closed for about 2 h 9 min between 06:00 and 22:00, across roughly 30 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (04:59–05:02, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:39–10:39 in the morning and around 14:53–15:53 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on North Lee Lane near Stoke Mandeville, Buckinghamshire.

Marsh Lane is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Down–Up line (Central route · ELR PRA). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 143 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was Β±21s (9 in 10 within 368s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’