User-worked with stop lights level crossing on the Kent route (ELR RTT).
| No trains in the next 30 minutes. |
On today’s timetable, Medhurst Row crossing is predicted to be closed for about 1 h 2 min between 06:00 and 22:00, across roughly 41 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 0.6 min (00:13–00:13, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:40–07:40 in the morning and around 14:50–15:50 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Medhurst Row is a user-worked with stop lights crossing (UWCMSL) on the Redhill–Tonbridge West Yard FLHH line (Kent route · ELR RTT). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 329 trains through this crossing.
99.7% of observed passes were being warned about on this page when they passed, and 98.0% of the warnings we could verify came true.
Typical timing error was ±15s (9 in 10 within 147s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.