Newark Castle level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR NOB1).

predicted
CLOSED
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · 23 min late

Next 30 min

CLOSED 08:02–08:04 1m
OPEN 08:04–08:14 10m
CLOSED 08:14–08:18 5m
OPEN 08:18–08:37 → 18m
Under the hood
Tue 06 Oct · 08:02
Today Tomorrow

Trains in window

07:58 🚆 2A12 Lincoln → Matlock Up (NE → SW) no show
08:01 🚄 1K57 Newark Castle → Crewe Up (NE → SW) active
08:03 🚆 2N47 Leicester → Lincoln Down (SW → NE) approaching
08:17 🚆 2J49 Ambergate → Cleethorpes Down (SW → NE) +1 min
08:18 🚆 2D40 Lincoln → Nottingham Up (NE → SW) on time
🚄Express passenger 🚆Passenger
now 08:02:57 · 81 avg · 5 in window
live observation: 0 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,460 active · 31,745 delays · 1,714 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Newark Castle crossing is predicted to be closed for about 4 h 14 min between 06:00 and 22:00, across roughly 60 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (01:56–01:59, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:53–07:53 in the morning and around 16:07–17:07 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Newark Castle is a cctv-monitored manual barrier crossing (CCTV) on the Rolleston–Retford line (East Coast route · ELR NOB1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 231 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.6% of the warnings we could verify came true.

Typical timing error was ±36s (9 in 10 within 145s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →