Normanton level crossing

Automatic half-barrier level crossing on the East Midlands route (ELR NOG1).

predicted
OPEN
for 21s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 1 min · on time

Next 30 min

OPEN 11:09–11:09 21s
CLOSED 11:09–11:10 1m
OPEN 11:10–11:15 4m
CLOSED 11:15–11:16 2m
OPEN 11:16–11:27 11m
CLOSED 11:27–11:29 1m
OPEN 11:29–11:55 → 26m
Under the hood
Mon 07 Sep · 11:09
Today Tomorrow

Trains in window

11:10 🚄 1R66 NorwichLiverpool Lime Street HL/ML Down (E → W) approaching
11:16 🚆 2S13 NottinghamSkegness Up (W → E) +5 min
11:29 🚆 2O08 SkegnessNottingham Down (E → W) +33 min
🚄Express passenger 🚆Passenger
now 11:09:10 · 62 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,728 active · 30,422 delays · 3,239 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Normanton crossing is predicted to be closed for about 2 h 6 min between 06:00 and 22:00, across roughly 43 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 2.9 min (06:56–06:59, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:12–11:12 in the morning and around 14:23–15:23 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Normanton is a automatic half-barrier crossing (AHB-X) on the Grantham–Elton & Orston line (East Midlands route · ELR NOG1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 440 trains through this crossing.

99.3% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±225s (9 in 10 within 488s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?