North Halling level crossing

User-worked with stop lights level crossing on the Kent route (ELR PWS2).

predicted
OPEN
for 2 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 3 min · on time

Next 30 min

OPEN 09:21–09:23 2m
CLOSED 09:23–09:24 50s
OPEN 09:24–09:39 15m
CLOSED 09:39–09:40 50s
OPEN 09:40–10:12 → 33m
Under the hood
Mon 07 Sep · 09:21
Today Tomorrow

Trains in window

09:24 🚆 2T19 TonbridgeStrood Up (S → N) approaching
09:40 🚆 2T22 StroodPaddock Wood Down (N → S) active
09:51 0Y21 Hoo Junction Up YardTonbridge West Yard GBRf Up (S → N) sched
🚆Passenger Other
now 09:21:49 · 78 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,495 active · 28,121 delays · 3,113 cancelled · 0 reconnects
About this crossing

How often it closes

On today’s timetable, North Halling crossing is predicted to be closed for about 2 h 1 min between 06:00 and 22:00, across roughly 63 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.2 min (07:06–07:08, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:04–07:04 in the morning and around 18:45–19:45 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

North Halling is a user-worked with stop lights crossing (UWCMSL) on the Strood–Allington Hanson Agg line (Kent route · ELR PWS2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 410 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 81.0% of the warnings we could verify came true.

Typical timing error was ±8s (9 in 10 within 49s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?