User-worked with stop lights level crossing on the Anglia route (ELR BGK).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 05:09 | 🚄 1T01 | Kings Lynn → London Kings Cross Up (N → S) | approaching |
On today’s timetable, Pleasants crossing is predicted to be closed for about 1 h 9 min between 06:00 and 22:00, across roughly 46 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 0.6 min (00:55–00:56, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:46–07:46 in the morning and around 18:35–19:35 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Pleasants is a user-worked with stop lights crossing (UWCMSL) on the Ely–Kings Lynn CS line (Anglia route · ELR BGK). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 211 trains through this crossing.
99.5% of observed passes were being warned about on this page when they passed, and 87.2% of the warnings we could verify came true.
Typical timing error was ±21s (9 in 10 within 367s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.