Poppleton level crossing

Manual gate level crossing on the North and East route (ELR HAY1).

predicted
CLOSED
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† now Β· 2 min late

Next 30 min

CLOSED 07:08–07:09 1m
OPEN 07:09–07:16 7m
CLOSED 07:16–07:19 3m
OPEN 07:19–07:39 β†’ 20m
Under the hood
Mon 12 Oct Β· 07:08
Today Tomorrow

Trains in window

07:09 πŸš† 2C00 Leeds β†’ York Up (W β†’ E) approaching
07:19 πŸš† 2C07 York β†’ Leeds Down (E β†’ W) active
πŸš†Passenger
now 07:08:27 Β· 59 avg Β· 2 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,708 active Β· 25,047 delays Β· 2,509 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Poppleton crossing is predicted to be closed for about 3 h 58 min between 06:00 and 22:00, across roughly 59 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:44–07:44 in the morning and around 18:48–19:48 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Upper Poppleton, North Yorkshire, next to Poppleton station.

Poppleton is a manual gate crossing (MGH) on the York–Milford West Sidings line (North and East route · ELR HAY1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 208 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was Β±49s (9 in 10 within 166s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?