Next 30 min

OPEN 09:59–10:04 5m
CLOSED 10:04–10:05 50s
OPEN 10:05–10:21 16m
CLOSED 10:21–10:22 50s
OPEN 10:22–10:24 2m
CLOSED 10:24–10:25 50s
OPEN 10:25–10:31 β†’ 6m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:52 πŸš† 2C19 London Waterloo β†’ Reading Down (S β†’ N) -1 min
09:54 πŸš† 2C26 Reading β†’ London Waterloo Up (N β†’ S) passed
09:57 πŸš„ 1V02 London Victoria (E) β†’ Oxford Parkway Down (S β†’ N) no show
10:05 πŸš„ 1O64 Reading β†’ Gatwick Airport Up (N β†’ S) approaching
10:22 πŸš† 2C21 London Waterloo β†’ Reading Down (S β†’ N) approaching
10:25 πŸš† 2C28 Reading β†’ London Waterloo Up (N β†’ S) active
πŸš„Express passenger πŸš†Passenger
now 09:59:38 Β· 165 avg Β· 6 in window
live observation: 2 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,962 cancelled Β· 9 reconnects
About this crossing

How often it closes

On today’s timetable, Smiths crossing is predicted to be closed for about 4 h between 06:00 and 22:00, across roughly 100 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.8 min (07:52–07:54, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:43–09:43 in the morning and around 20:24–21:24 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Wokingham, Berkshire.

Smiths is a user-worked with stop lights crossing (UWCMSL) on the Bracknell–Reading Platforms 4A/4B line (Wessex route · ELR RDG1). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 800 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.8% of the warnings we could verify came true.

Typical timing error was Β±4s (9 in 10 within 48s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.