Speedway level crossing

Automatic open level crossing level crossing on the Western route (ELR SUT1).

right now
OPEN
for 5 min
next: 🚃 in 7 min · running

Next 30 min

OPEN 01:10–01:16 5m
CLOSED 01:16–01:17 2m
OPEN 01:17–01:51 → 34m
Under the hood
Fri 24 Jul · 01:10
Today Tomorrow

Trains in window

01:17 5P29 🚃 PLYMTH → LARATMD ← from Laira TMD Fuel road active
🚃Empty stock
now 01:10:50 · 163 avg · 1 in window
lx berths down: PH/0365→PH/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,123 delays · 1,793 cancelled · 0 reconnects
About this crossing

How often it closes

On today’s timetable, Speedway crossing is predicted to be closed for about 4 h 19 min between 06:00 and 22:00, across roughly 91 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:43–00:44, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:03–07:03 in the morning and around 20:56–21:56 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Speedway is a automatic open level crossing crossing (AOCL) on the Laira TMD Fuel road–Laira T.& R.S.M.D. line (Western route · ELR SUT1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 127 trains through this crossing.

83.5% of observed passes were being warned about on this page when they passed, and 16.5% of the warnings we could verify came true.

Typical timing error was ±255s (9 in 10 within 1390s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?