CCTV-monitored manual barrier level crossing on the Anglia route (ELR NOL).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 11:04 | 🚆 2J72 | Norwich → Lowestoft Down (NW → SE) | on time |
| 11:19 | 🚆 2J73 | Lowestoft → Norwich Up (SE → NW) | approaching |
On today’s timetable, Strumpshaw crossing is predicted to be closed for about 2 h 54 min between 06:00 and 22:00, across roughly 37 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.7 min (08:27–08:33, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:41–08:41 in the morning and around 15:20–16:20 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Strumpshaw is a cctv-monitored manual barrier crossing (CCTV) on the Norwich C.Pt. T.&R.S.M.D–Reedham (Norfolk) line (Anglia route · ELR NOL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 509 trains through this crossing.
76.2% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.
Typical timing error was ±2s (9 in 10 within 19s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.