Sunningdale level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR RDG1).

predicted
OPEN
for 21 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 24 min Β· 1 min early

Next 30 min

OPEN 05:47–06:08 21m
CLOSED 06:08–06:14 7m
OPEN 06:14–06:35 β†’ 21m
Under the hood
Fri 23 Oct Β· 05:47
Today Tomorrow

Trains in window

05:40 πŸš† 2C03 Staines β†’ Reading Down (SE β†’ NW) -1 min
05:45 πŸš† 2C08 Ascot β†’ London Waterloo Up (NW β†’ SE) passed
06:11 πŸš† 2C10 Reading β†’ London Waterloo Up (NW β†’ SE) approaching
06:14 πŸš† 2C05 London Waterloo β†’ Reading Down (SE β†’ NW) -1 min
πŸš†Passenger
now 05:47:29 Β· 91 avg Β· 4 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-22..2026-10-24
fetched 02:08:21
trust 34,365 active Β· 30,150 delays Β· 2,694 cancelled Β· 0 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Sunningdale crossing is predicted to be closed for about 4 h 44 min between 06:00 and 22:00, across roughly 66 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:02–00:05, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:34–07:34 in the morning and around 18:35–19:35 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on London Road in Sunningdale, Berkshire, next to the station.

Sunningdale is a CCTV-monitored manual barrier crossing (CCTV) on the Virginia Water–Ascot line (Wessex route · ELR RDG1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 299 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 96.5% of the warnings we could verify came true.

Typical timing error was Β±3s (9 in 10 within 20s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?