Three Gates level crossing

User-worked with stop lights level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for 9 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 9 min Β· 1 min early

Next 30 min

OPEN 09:58–10:07 9m
CLOSED 10:07–10:08 50s
OPEN 10:08–10:18 11m
CLOSED 10:18–10:19 50s
OPEN 10:19–10:36 β†’ 17m
Under the hood
Thu 22 Oct Β· 09:58
Today Tomorrow

Trains in window

09:56 πŸš„ 1V04 Nottingham β†’ Cardiff Central Down (NE β†’ SW) passed
09:57 πŸš› 6B13 Robeston Sdgs β†’ Westerleigh Puma DBC Up (SW β†’ NE) no show
09:57 πŸš† 2G54 Cardiff Central β†’ Cheltenham Spa Up (SW β†’ NE) passed
10:07 πŸš„ 1S43 Cardiff Central β†’ Edinburgh Up (SW β†’ NE) -1 min
10:19 πŸš† 2G51 Cheltenham Spa β†’ Cardiff Central Down (NE β†’ SW) approaching
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 09:58:38 Β· 108 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,697 delays Β· 1,962 cancelled Β· 9 reconnects
About this crossing

How often it closes

On today’s timetable, Three Gates crossing is predicted to be closed for about 2 h 4 min between 06:00 and 22:00, across roughly 65 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 0.6 min (00:14–00:14, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:22–10:22 in the morning and around 17:38–18:38 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is near Chepstow, Monmouthshire.

Three Gates is a user-worked with stop lights crossing (UWCMSL) on the Gloucester–Llanwern Exchange Sdgs line (Wales route · ELR SWM2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 419 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.3% of the warnings we could verify came true.

Typical timing error was Β±4s (9 in 10 within 60s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?