CCTV-monitored manual barrier level crossing on the Anglia route (ELR BGK).
| 01:19 | 3S50 | 🚧 | STWMDGL → STWMDGL | ← Down | cancelled |
On today’s timetable, Watlington Road crossing is predicted to be closed for about 1 h 42 min between 06:00 and 22:00, across roughly 25 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (00:31–00:34, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:53–07:53 in the morning and around 19:50–20:50 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Watlington Road is a cctv-monitored manual barrier crossing (CCTV) on the Down–Up line (Anglia route · ELR BGK). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 183 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 94.8% of the warnings we could verify came true.
Typical timing error was ±23s (9 in 10 within 101s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.