Winchelsea level crossing

Automatic open level crossing with barriers level crossing on the Kent route (ELR ATH).

predicted
OPEN
for 12s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 1 min · on time

Next 30 min

OPEN 16:47–16:47 12s
CLOSED 16:47–16:49 2m
OPEN 16:49–17:42 → 53m
Under the hood
Thu 08 Oct · 16:47
Today Tomorrow

Trains in window

16:45 🚆 2D46 Eastbourne → Ashford International Up (SW → NE) passed
16:48 🚆 2D43 Ashford International → Eastbourne Down (NE → SW) approaching
🚆Passenger
now 16:47:22 · 38 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,613 active · 32,041 delays · 2,178 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Winchelsea crossing is predicted to be closed for about 1 h 19 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.0 min (07:41–07:45, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 20:51–21:51 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Winchelsea is a automatic open level crossing with barriers crossing (AOCLB) on the Rye–Ore line (Kent route · ELR ATH). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 221 trains through this crossing.

99.1% of observed passes were being warned about on this page when they passed, and 98.7% of the warnings we could verify came true.

Full accuracy report →

Is this right?