Worlaby (uwcmsl) level crossing

User-worked with stop lights level crossing on the North and East route (ELR DOW).

predicted
CLOSED
for 31s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ now Β· 1 min late

Next 30 min

CLOSED 10:00–10:01 31s
OPEN 10:01–10:14 14m
CLOSED 10:14–10:15 50s
OPEN 10:15–10:37 β†’ 21m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:59 πŸš› 6K22 Santon F.O.T. β†’ Immingham B.S.C. Ore Tml Up (NW β†’ SE) passed
10:01 πŸš„ 1B73 Cleethorpes β†’ Liverpool Lime Street HL/ML Down (SE β†’ NW) approaching
10:15 πŸš„ 1B68 Liverpool Lime Street HL/ML β†’ Cleethorpes Up (NW β†’ SE) on time
πŸš„Express passenger πŸš›Freight
now 10:00:39 Β· 144 avg Β· 3 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,964 cancelled Β· 9 reconnects
About this crossing

How often it closes

On today’s timetable, Worlaby (uwcmsl) crossing is predicted to be closed for about 2 h 3 min between 06:00 and 22:00, across roughly 62 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.4 min (07:12–07:13, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:53–11:53 in the morning and around 12:59–13:59 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Carr Lane near Broughton, Lincolnshire.

Worlaby (uwcmsl) is a user-worked with stop lights crossing (UWCMSL) on the Barnetby Sdgs Colas Rail–Scunthorpe Trent T.C. line (North and East route · ELR DOW). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 463 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was Β±2s (9 in 10 within 43s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?