Automatic half-barrier level crossing on the Western route (ELR DCL).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:53 | π 4O14 | Garston F.L.T. β Southampton M.C.T. Up (N β S) | on time |
| 09:56 | π 1M30 | Bournemouth β Manchester Piccadilly Down (S β N) | +11 min |
| 09:56 | π 4M50 | Southampton M.C.T. β Basford Hall Yard Down (S β N) | no show |
| 10:02 | π 6M20 | Bicester MOD GBRf β Kineton MOD GBRf Down (S β N) | no show |
| 10:02 | π 2V19 | Banbury β Didcot Parkway Up (N β S) | approaching |
| 10:07 | π 6V16 | Kineton MOD GBRf β Bicester MOD GBRf Up (N β S) | no show |
| 10:14 | π 1O08 | Manchester Piccadilly β Bournemouth Up (N β S) | +2 min |
| 10:18 | π 1E32 | Reading β York Down (S β N) | +1 min |
| 10:21 | π 4M37 | Southampton W.Docks β Hams Hall GBRF Down (S β N) | no show |
| 10:25 | π 4M32 | Southampton W.Docks β Hams Hall GBRF Down (S β N) | +4 min |
On todayβs timetable, Yarnton Lane crossing is predicted to be closed for about 3 h 6 min between 06:00 and 22:00, across roughly 77 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.6 min (00:26–00:29, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:49β07:49 in the morning and around 17:33β18:33 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Green Lane in Yarnton, Oxfordshire.
Yarnton Lane is a automatic half-barrier crossing (AHB-X) on the OxfordβBanbury line (Western route · ELR DCL). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 721 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.
Typical timing error was Β±3s (9 in 10 within 14s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.