Adelaide level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR SDP1).

predicted
CLOSED
for 2 min
barriers confirmed down by live signalling data

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 2 min Β· on time

Next 30 min

CLOSED 07:38–07:40 2m
OPEN 07:40–07:47 7m
CLOSED 07:47–07:50 3m
OPEN 07:50–07:53 3m
CLOSED 07:53–07:56 3m
MAY OPEN 07:56–07:57 34s
CLOSED 07:57–08:04 7m
OPEN 08:04–08:14 β†’ 10m
Under the hood
Wed 11 Nov Β· 07:38
Today Tomorrow

Trains in window

07:31 πŸš† 2E09 Southampton Central β†’ Portsmouth & Southsea Down (SW β†’ NE) +1 min
07:40 πŸš† 2E12 Portsmouth & Southsea β†’ Southampton Central Up (NE β†’ SW) approaching
07:50 πŸš„ 1F03 Bristol Temple Meads β†’ Portsmouth Harbour Down (SW β†’ NE) +3 min
07:56 πŸš„ 1N11 Southampton Central β†’ Brighton Down (SW β†’ NE) active
07:59 πŸš„ 1N06 Brighton β†’ Southampton Central Up (NE β†’ SW) +2 min
08:01 πŸš† 2E91 Southampton Central β†’ Portsmouth Harbour Down (SW β†’ NE) active
08:04 πŸš„ 1F08 Portsmouth Harbour β†’ Cardiff Central Up (NE β†’ SW) +1 min
πŸš„Express passenger πŸš†Passenger
now 07:38:53 Β· 158 avg Β· 7 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,753 active Β· 31,256 delays Β· 2,064 cancelled Β· 0 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Adelaide crossing is predicted to be closed for about 7 h 25 min between 06:00 and 22:00, across roughly 100 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.2 min (07:20–07:24, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:28–10:28 in the morning and around 16:00–17:00 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Adelaide Road in St Denys, Hampshire, next to the station.

Adelaide is a CCTV-monitored manual barrier crossing (CCTV) on the Southampton Central–Bitterne line (Wessex route · ELR SDP1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,104 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.

Typical timing error was Β±23s (9 in 10 within 166s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?