Mount Pleasant level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR BML1).

predicted
OPEN
for 5 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 8 min · 14 min late

Next 30 min

OPEN 02:35–02:39 5m
CLOSED 02:39–02:43 3m
OPEN 02:43–03:22 → 39m
Under the hood
Fri 13 Nov · 02:35
Today Tomorrow

Trains in window

02:29 🚛 4O08 Trafford Park F.L.T. → Southampton M.C.T. Down (N → S) no show
02:43 🚛 4O31 Doncaster Europort → Southampton M.C.T. Down (N → S) +14 min
02:53 🚧 6J86 Eastleigh East Yard → Eastleigh East Yard Down (N → S) no show
🚛Freight 🚧Engineering
now 02:35:16 · 448 avg · 3 in window
live observation: 2 up · 2 down
timetable cif full+upd 2026-11-12..2026-11-14
fetched 02:08:19
trust 32,660 active · 30,825 delays · 2,099 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Mount Pleasant crossing is predicted to be closed for about 12 h 14 min between 06:00 and 22:00, across roughly 138 closures. The longest single predicted closure is 15 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.0 min (00:08–00:14, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:30–08:30 in the morning and around 16:04–17:04 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Mount Pleasant Road in Newtown, Hampshire.

Mount Pleasant is a CCTV-monitored manual barrier crossing (CCTV) on the St. Denys–Southampton Central line (Wessex route · ELR BML1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 2,545 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±6s (9 in 10 within 30s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?