Adversane level crossing

Automatic half-barrier level crossing on the Sussex route (ELR TBH1).

predicted
OPEN
for 12 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 14 min · on time

Next 30 min

OPEN 06:46–06:59 12m
CLOSED 06:59–07:00 2m
OPEN 07:00–07:04 4m
CLOSED 07:04–07:06 2m
OPEN 07:06–07:29 → 23m
Under the hood
Tue 06 Oct · 06:46
Today Tomorrow

Trains in window

06:37 🚄 1C07 Portsmouth Harbour → Horsham Up (SW → NE) +1 min
07:00 🚄 1B09 Bognor Regis → London Victoria (C) Up (SW → NE) on time
07:05 🚄 1C04 London Victoria (C) → Portsmouth Harbour Down (NE → SW) on time
07:06 🚄 1C09 Portsmouth Harbour → Horsham Up (SW → NE) on time
🚄Express passenger
now 06:46:46 · 133 avg · 4 in window
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,338 active · 31,667 delays · 1,667 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Adversane crossing is predicted to be closed for about 4 h 54 min between 06:00 and 22:00, across roughly 115 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:29–09:29 in the morning and around 20:45–21:45 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Adversane is a automatic half-barrier crossing (AHB) on the Horsham–Pulborough line (Sussex route · ELR TBH1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?