Ainsdale level crossing

CCTV-monitored manual barrier level crossing on the North West route (ELR HXS3).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:24–04:24+ 2h+
Under the hood
Thu 15 Oct · 02:24
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 02:24:15 · 148 avg · 0 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-14..2026-10-16
fetched 02:08:21
trust 32,456 active · 31,159 delays · 1,732 cancelled · 9 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Ainsdale crossing is predicted to be closed for about 5 h 41 min between 06:00 and 22:00, across roughly 67 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (23:59–00:02, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:19–07:19 in the morning and around 20:20–21:20 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Ainsdale, Merseyside, next to the station.

Ainsdale is a CCTV-monitored manual barrier crossing (CCTV) on the Sandhills–Southport C.H.S. line (North West route · ELR HXS3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 954 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Typical timing error was ±24s (9 in 10 within 45s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →