Crescent Road level crossing

Automatic half-barrier level crossing on the North West route (ELR HXS3).

predicted
CLOSED
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† now Β· on time

Next 30 min

CLOSED 09:42–09:43 1m
OPEN 09:43–09:49 6m
CLOSED 09:49–09:50 1m
OPEN 09:50–09:57 8m
CLOSED 09:57–09:59 2m
OPEN 09:59–10:04 5m
CLOSED 10:04–10:05 1m
OPEN 10:05–10:12 β†’ 8m
Under the hood
Sat 17 Oct Β· 09:42
Today Tomorrow

Trains in window

09:33 πŸš† 2S11 Liverpool Central (Northern) β†’ Southport Down (SW β†’ NE) -2 min
09:43 πŸš† 2G16 Southport β†’ Liverpool Central (Northern) Up (NE β†’ SW) approaching
09:50 πŸš† 2S12 Liverpool Central (Northern) β†’ Southport Down (SW β†’ NE) approaching
09:59 πŸš† 2G17 Southport β†’ Liverpool Central (Northern) Up (NE β†’ SW) active
10:04 πŸš† 2S13 Liverpool Central (Northern) β†’ Southport Down (SW β†’ NE) -1 min
πŸš†Passenger
now 09:42:28 Β· 121 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 40,996 active Β· 36,405 delays Β· 2,752 cancelled Β· 0 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Crescent Road crossing is predicted to be closed for about 5 h 16 min between 06:00 and 22:00, across roughly 126 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (07:40–07:43, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:22–07:22 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Grosvenor Road in Birkdale, Merseyside.

Crescent Road is a automatic half-barrier crossing (AHB) on the Sandhills–Southport C.H.S. line (North West route · ELR HXS3). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 934 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.5% of the warnings we could verify came true.

Typical timing error was Β±15s (9 in 10 within 24s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?