Albion Street level crossing

Manually-controlled barrier level crossing on the Anglia route (ELR ESK).

predicted
CLOSED
for 15s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · on time

Next 30 min

CLOSED 08:16–08:16 15s
OPEN 08:16–09:49 → 93m
Under the hood
Mon 12 Oct · 08:16
Today Tomorrow

Trains in window

08:12 🚆 2D70 Ipswich → Lowestoft Down (SW → NE) passed
08:16 🚆 2D71 Lowestoft → Ipswich Up (NE → SW) approaching
08:37 🚛 4A26 Sizewell TCA → Parkeston S.S. Up (NE → SW) sched
🚆Passenger 🚛Freight
now 08:16:09 · 34 avg · 3 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,964 active · 26,774 delays · 2,612 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Albion Street crossing is predicted to be closed for about 1 h 59 min between 06:00 and 22:00, across roughly 20 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (03:34–03:37, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:26–07:26 in the morning and around 15:39–16:39 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Albion Street in Saxmundham, Suffolk, next to the station.

Albion Street is a manually-controlled barrier crossing (MCB/MB) on the Ipswich–Sizewell TCA line (Anglia route · ELR ESK). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 238 trains through this crossing.

99.6% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±14s (9 in 10 within 303s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →