Remotely-monitored manually-controlled barrier level crossing on the Anglia route (ELR ESK).
| No trains in the next 30 minutes. |
On today’s timetable, Chantry Road crossing is predicted to be closed for about 1 h 53 min between 06:00 and 22:00, across roughly 19 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:25–07:25 in the morning and around 15:39–16:39 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Chantry Road is a remotely-monitored manually-controlled barrier crossing (MCBR) on the Woodbridge–Sizewell TCA line (Anglia route · ELR ESK). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway.