Alstone level crossing

Manually-controlled barrier level crossing on the Western route (ELR BAG2).

predicted
OPEN
for 22 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚃 in 25 min · 19 min early

Next 30 min

OPEN 04:54–05:16 22m
CLOSED 05:16–05:19 3m
OPEN 05:19–06:01 → 42m
Under the hood
Mon 07 Sep · 04:54
Today Tomorrow

Trains in window

04:47 🚛 6M29 Cardiff Tidal T.C.Kingsbury EMR Sidings Up (S → N) no show
05:19 🚃 3G14 Stoke Gifford IEP DepotGreat Malvern Up (S → N) -19 min
05:21 🚛 6M27 Cardiff Tidal T.C.Saltley Dunns Siding Up (S → N) no show
🚃Empty stock 🚛Freight
now 04:54:27 · 151 avg · 3 in window
live observation: 0 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,716 active · 21,543 delays · 2,956 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Alstone crossing is predicted to be closed for about 7 h 19 min between 06:00 and 22:00, across roughly 92 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:23–00:26, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:11–08:11 in the morning and around 12:23–13:23 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Alstone is a manually-controlled barrier crossing (MCB/MB) on the Worcestershire Parkway HL–Cheltenham Spa line (Western route · ELR BAG2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 810 trains through this crossing.

57.4% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±9s (9 in 10 within 185s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?