Horton Road level crossing

Manually-controlled barrier level crossing on the Western route (ELR SWM2).

predicted
OPEN
for 10 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 13 min Β· running

Next 30 min

OPEN 10:00–10:09 10m
CLOSED 10:09–10:15 6m
OPEN 10:15–10:22 6m
CLOSED 10:22–10:27 6m
MAY OPEN 10:27–10:28 41s
CLOSED 10:28–10:31 β†’ 3m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:51 πŸš„ 1M01 Cardiff Central β†’ Nottingham Up (NW β†’ SE) no show
09:57 πŸš† 2V54 Weymouth β†’ Gloucester Down (SE β†’ NW) -4 min
10:12 πŸš† 2C10 Gloucester β†’ Westbury Up (NW β†’ SE) active
10:15 πŸš„ 1L70 Cheltenham Spa β†’ London Paddington Down (SE β†’ NW) active
10:25 πŸš„ 1V05 Nottingham β†’ Cardiff Central Down (SE β†’ NW) on time
10:27 πŸš„ 1G07 London Paddington β†’ Cheltenham Spa Down (SE β†’ NW) +9 min
10:31 πŸš† 2E55 Bristol Temple Meads β†’ Worcester Foregate Street Down (SE β†’ NW) on time
πŸš„Express passenger πŸš†Passenger
now 10:00:09 Β· 230 avg Β· 7 in window
live observation: 0 up Β· 2 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Horton Road crossing is predicted to be closed for about 9 h 25 min between 06:00 and 22:00, across roughly 102 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.5 min (09:20–09:27, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:30–08:30 in the morning and around 14:05–15:05 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Horton Road in Gloucester, Gloucestershire.

Horton Road is a manually-controlled barrier crossing (MCB/MB) on the Cheltenham Spa–Gloucester line (Western route · ELR SWM2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 432 trains through this crossing.

97.5% of observed passes were being warned about on this page when they passed, and 98.4% of the warnings we could verify came true.

Typical timing error was Β±82s (9 in 10 within 270s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?