CCTV-monitored manual barrier level crossing on the Western route (ELR BGL2).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 01:52–03:52+ 2h+
Under the hood
Fri 13 Nov · 01:52
Today Tomorrow

Trains in window

01:43 🚛 6V36 Tunstead Sdgs (FHH) → Westbury Tarmac Down (N → S) no show
01:59 🚛 6M53 Parkandillack → Cliffe Vale Terminal Up (S → N) no show
02:17 🚛 6M94 Margam T.C. → Corby B.S.C. Up (S → N) no show
🚛Freight
now 01:52:35 · 164 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-11-11..2026-11-13
fetched 02:08:16
trust 33,903 active · 31,402 delays · 2,609 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Old Ends crossing is predicted to be closed for about 7 h 34 min between 06:00 and 22:00, across roughly 89 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:06–00:09, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:46–10:46 in the morning and around 15:05–16:05 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Oldends Lane in Stonehouse, Gloucestershire.

Old Ends is a CCTV-monitored manual barrier crossing (CCTV) on the Stroud–Westerleigh Puma DBC line (Western route · ELR BGL2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 891 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was ±4s (9 in 10 within 18s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →