Naas level crossing

Automatic half-barrier level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for 2 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 4 min · on time

Next 30 min

OPEN 16:53–16:56 2m
CLOSED 16:56–16:57 2m
OPEN 16:57–17:06 9m
CLOSED 17:06–17:08 2m
OPEN 17:08–17:25 → 18m
Under the hood
Thu 08 Oct · 16:53
Today Tomorrow

Trains in window

16:50 🚄 1V11 Nottingham → Cardiff Central Down (NE → SW) +5 min
16:55 🚛 6V07 Round Oak → Margam T.C. Down (NE → SW) no show
16:57 🚆 2G68 Cardiff Central → Cheltenham Spa Up (SW → NE) on time
17:07 🚆 2G65 Cheltenham Spa → Cardiff Central Down (NE → SW) -1 min
17:18 🚃 3G05 Canton C.S.D. → Gloucester Up (SW → NE) no reports
🚄Express passenger 🚆Passenger 🚃Empty stock 🚛Freight
now 16:53:47 · 107 avg · 5 in window
live observation: 0 up · 1 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,617 active · 32,043 delays · 2,183 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Naas crossing is predicted to be closed for about 2 h 56 min between 06:00 and 22:00, across roughly 66 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (02:20–02:21, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:44–11:44 in the morning and around 17:04–18:04 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Naas is a automatic half-barrier crossing (AHB) on the Gloucester–Llanwern Exchange Sdgs line (Wales route · ELR SWM2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 192 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 95.9% of the warnings we could verify came true.

Full accuracy report →

Is this right?